Westfield Zei220 pictures
- 12th May 2002 - Last of the tiger and initial stripping
- 15th May 2002 - Stripdown detail
- 21st May 2002 - Engine bay
- 27th May 2002 - Boot area and alternator mount
- 6th June 2002 - Naked chassis and body
- 9th June 2002 - Engine, box and diff out
- 14 June - At the factory
- 18th July 2002 - Sump and new chassis panels going in
- 20th July 2002 - Fixing a panel
- 31st July 2002 - Chassis underside and pedal box
- 5th August 2002 - Pipework going on
- 11th August 2002 - Oil cooler, rad and ducting
- 18th August 2002 - Rear suspension, diff and swirl pot
- 25th August 2002 - Oil breather and thermoblock, fuel system
- 1st September 2002 - ECU
- 8th September 2002 - Front suspension and engine bay wiring
- 11th September 2002 - Breather ports
- 13th September 2002 - Caliper, Oil separator and gearbox in
- 21st September 2002 - Catch tank and front suspension
- 28th September 2002 - Engine in
6th October 2002 - Scuttle on and engine positioning
- 12th October 2002 - Catch tank and fuel system plumbed in
- 13th October 2002 - Breather bracket and underside of chassis
- 19th October 2002 - Bodywork on
- 14th November 2002 - Suspension geometry and bodywork trimming
- 26th November 2002 - Clutch arm cover, ARB cutouts and intercooler prototype 1
- 1st Decemeber 2002 - Nosecone, fan and ducting
- 20th Decemeber 2002 - Bodywork fettling
- 26th Decemeber 2002 - Nosecone on
- 5th January 2003 - Battery tray
- 12th January 2003 - Brake disks and rear lighting
- 24th January 2003 - New engine mounts
- 20th February 2003 - Boot box, scuttle and engine plumbing
- 2nd March 2003 - Dash wiring, intercooler prototype 2
- 9th March 2003 - Exhaust bracket, chargecooler prototype 1
- 28th March 2003 - NACA ducts, exhaust clearance
- 4th April 2003 - Boot box
- 5th April 2003 - Boot box, speedo drive, new engine mount
- 8th April 2003 - Boot box and front arches
- 14th April 2003 - Boot box and NACA duct
- Chargecooler arrives - 29th April 2003
- 8th May 2003 - Spare manifold, chargecooler
- 13th May 2003 - Dash, chargecooler and inlet
- 14th May 2003 - Broken fuel sender and oil cooler mount
- 16th May 2003 - Oil cooler mount again
- 17th May 2003 - New fan mounting
- 18th May 2003 - Interior
- 21st May 2003 - Chargecooler and throttle mount
- 26th May 2003 - Turbo heatshield and pipework
- 1st June 2003 - Engine starts
- 17th June 2003 - Lotus 7 club meeting
- 19th June 2003 - The finished car
- 30th June 2003 - Wind deflector and loom wire
- 4th July 2003 - Top box modifications
- 24th July 2003 - Boot lid
- 1st August 2003 - Catherine Driving!
- 5th August 2003 - Snetterton trackday
- 27th September 2003 - Bassingbourn trackday
- 7th October 2003 - New pre-rad and modular loom
- 12th October 2003 - New pre-rad installed
- 18th October 2003 - Bassingbourn again
- 2nd February 2004 - Winter improvements
- 13th February 2004 - Plenum prototype
- 1st March 2004 - Emerald rolling road
Chris Good